Javascript Menu by Deluxe-Menu.com
HOME | SEARCH | HELP | CONTACT  
Northeast Controls Live Help
search us
  REQUEST FORMS
  Forms Index
  General Requests
  Anderson Separators
  Desuperheater
  Eductor Gas-Gas
  Eductor Inline Heating
  Eductor Moving Solids
  Eductor Liquid-Liquid
  Eductor Liquid-Gas
  Eductor Tank Heating
  Eductor Tank Mixing
  Flow Meter (General)
  Flow Meter (Blancett)
  Flow Meter (RCM)
  Flow Switches
  Inline Pipe Heater
  Jacoby Tarbox
  Jensen Mixers
  Jerguson Gage & Valve
  Liquid Level Gages
  Magnetic Level Gages
  Purifier - Separators
  Side-Entry Mixers
  Sight Flow Indicators
  Tank Heating Eductor
  Tank Mixing Eductor
  Washdown Stations
   
 
   

 

Jensen Mixer Request Form

A Proven Performer.  Jensen Mixers hang directly on your tank's manway (only).  No need for additional equipment such as tie rods and/or a base (unlike our competition).  Jensen Mixers' short shaft design (which is supported both at the front and rear of the shaft) provides for vibration-free service. This ensures a long life to the mixer's mechanical seal, gearbox, bearings etc.  Only Jensen Mixer provides you with a (mixer) propeller custom pitched for your application.  Jensen Mixer has well over 15,000 mixers in service today.  Go with Jensen and get unequaled experience, time proven designs that out-perform and out-last all of our competitors. Visit our site page http://www.nciweb.net/jensen.htm for more details.
 
* Required Information.
*Your Name
*Company Name
*Street Address
*City:
*U.S. State:
if other
*Country:
it other
*Email
*Telephone Number
*Fax Number
Please Contact Us Via
email | telephone | fax
How Did You Find Us?
Process Description

(1) Type of Process (Select one of more of the following which best describes the requirements of your process)

(A) Liquids
(B) Liquid-Solid
(C) Liquid-Gas
(2) How Agitation Results Are Measured
Select one of more of the following which best describes the requirements of your process.
(A) Liquids
(B) Liquid-Solid
(C) Liquid-Gas
(3) Desired Process Results
   
  Name Wt. % Sp.Gr. Viscosity Temp.
Liquid 1
Liquid 2
Liquid 3
  Name Wt. % Sp.Gr. Viscosity Temp.
Solid 1
Solid 2
  Name Flow Rate Pressure Temp.  
Gas 1
 
Gas 2
 
  Specific Gravity Viscosity Temp. Volume  
Mixture
 
(5) Operation:
Batch: Continuous:
  Normal Maximum Minimum Flow Rate
Volume
Batch Time:
Hours  
 
Materials of Construction
 
Shaft:
 
 
Impeller:
 
 
Seal
  None Single Mechanical
  Standard Stuff Double Mechanical
  Vapor Seal Lubricant:
 
Vessel
    Straight Side Overall Height
Size:
  Top: Open Closed ASME Dish Standard Dish
  Bottom: Flat ASME Dish Standard Dish
  Length Width Height
If Rectangle/Square
       
No. of Baffles
Width ?
Wall Clearance ?
Pressure ?
 
Motor
 
Volts
Cycles
Phase
 
Enclosure:
TEFC Severe Chemical Duty Explosion Proof
   
 
Duty (check closest to your time frame)
 
8 Hours Per Day 16 Hours Per Day 24 Hours Per Day
 
Thank You For Taking The Time To Fill Out This Online Form
 

 

 
 
Northeast Controls Incorporated
Tel: 1-201-327-7660 | Fax: 1-201-327-3242 | email: sales@nciweb.com
123 Pleasant Avenue - Upper Saddle River - New Jersey 07458 USA
© 1995-2007 Northeast Controls Incorporated.  All Rights Reserved.